New construction, additions, basement finishes, or full room replacements — we hang, tape, float, and finish drywall to a smooth, paint-ready surface.

Drywall is the substrate for everything you'll see afterward. A wall that's hung tight and floated wide takes paint evenly and disappears. A wall with a proud seam or a shallow float will show a shadow line across it every evening when the light comes in low, and no amount of paint fixes that. Since I'm the one painting it afterward, there's nobody to hand that problem to.

Finished interior room with smooth painted drywall walls and stained ceiling beams

How the work runs

  1. 1

    Assess & measure

    Framing checked, board type and layout planned, texture match discussed.

  2. 2

    Hang

    Ceilings then walls, seams placed away from raking light, fasteners set to a dimple.

  3. 3

    Tape & bead

    Seams bedded, corner bead set, inside corners worked one side at a time.

  4. 4

    Float in coats

    Multiple coats, each feathered wider; full dry time between them.

  5. 5

    Sand & contain dust

    Floated areas brought flush with doorways sealed and returns covered.

  6. 6

    Texture (if matching)

    Knockdown or orange peel matched to existing by sample.

  7. 7

    Prime, inspect, paint

    Drywall primer to even out porosity, light inspection, then finish coats.

Hanging: layout before speed

Before a sheet goes up, framing gets checked — proud studs, twisted members, missing blocking at panel edges, and protruding fasteners all telegraph through the finished wall. Fixing framing takes minutes; finishing around it takes hours.

Sheets get laid out to minimize seams and, where possible, to keep butt joints away from the places light rakes hardest — long hallway walls and the wall opposite a window. Ceilings go up first, then walls, so the wall sheets support the ceiling edge. Board type gets matched to the room: moisture-resistant board in bathrooms and behind tile, appropriate board where fire separation matters, such as a garage-to-house wall or a basement mechanical area.

Fasteners get set to a dimple, not driven through the paper — an overdriven screw has almost no holding power and pops later. Panel edges land on framing, gaps at edges stay tight, and outlets and can lights get cut precisely rather than oversized and filled.

Taping and floating: the part that takes patience

Tape coat first: joint compound bedded under paper or mesh tape on every seam, with corner bead set at outside corners and inside corners taped and worked one side at a time so the angle stays crisp. Fastener heads get their first fill in the same pass.

Then filling and floating, in multiple coats — each one wider than the last, feathered out well past the seam. Butt joints get the widest float, because they don't have a factory taper to hide in. This is where a fast drywall job and a good one separate: the compound work is what makes a seam vanish under paint, and rushing the width is the most common cause of visible seams.

Each coat has to dry before the next. Drying time is a real scheduling factor in Kansas City — a humid week slows compound noticeably, and a dry, heated house in winter speeds it up. Compound applied over compound that isn't dry will shrink and crack.

Sanding, dust control, and texture

Sanding brings the floated areas flush with the board face. Sanding drywall generates fine dust that travels, so containment matters: doorways sealed, HVAC returns covered, floors protected, and vacuum-assisted or wet sanding where it makes sense. The alternative is finding drywall dust on the top of the kitchen cabinets a month later.

Texture is a choice. A smooth level finish is the most demanding and the least forgiving — every imperfection shows, which is why the floating has to be wide and the sanding careful. Knockdown or orange-peel textures are common on KC ceilings and are also the practical way to match existing texture in a repair or an addition, so a new room doesn't read as obviously new next to the old one. Matching existing texture is its own skill and we do it by sample, not by eye alone.

Priming and painting a new surface

New drywall must be primed, and not with a finish coat pressed into service. Board face and joint compound absorb very differently: paint straight onto that mix comes out with the seams showing as dull bands — joint banding — even when the compound work was good. A drywall primer or PVA seals both to the same porosity so the finish coats lay down uniformly.

After priming is also the honest moment to inspect. Primer reveals what bare board hides, so we look at the walls with a light before finish coats, spot any high or low areas, fix them, spot-prime, and then paint. Because we handle the interior painting too, that fix happens in the same visit instead of turning into a scheduling argument between trades.

Timeline and what to expect day to day

A single room replacement is typically a few days end to end, since it's hang, then a coat a day while compound dries, then sand, prime, and paint. Larger additions and basement finishes run longer, driven mostly by drying time between coats rather than the hanging itself.

Expect noise during hanging and a dusty stage during sanding — that's the day to keep pets and anyone dust-sensitive out of that part of the house. We contain it, but we won't claim there's no dust. Between coats there are quiet days where nothing appears to happen; that's compound drying, and pushing through it causes cracking.

What I check before I call it done

Bright light held flat against the wall along every seam, corner, and fastener line — that's the only way to catch a shadow before paint does it for you. Inside corners straight, outside beads clean and not overfilled, no ridges at butt joints, no sanding scuffs into the board paper.

Cutouts checked against plates and fixtures, texture matched where it needs to match, and the space cleaned before priming. Then it gets primed and inspected again, because that's the last chance to catch anything before finish coats hide it.

Before I call it done

  • No shadow lines at seams or butt joints under a light held flat to the wall
  • Inside corners straight; outside bead clean, not overfilled
  • No overdriven or proud fasteners; no paper scuffed through by sanding
  • Texture matches adjacent existing surfaces where required
  • Primed before finish coats, and re-inspected after priming

Where we do this work

Drywall Installation across the Kansas City metro, with most projects in Johnson County KS, the Northland, and Lee's Summit MO.

Other services

Common questions

All of it — hang, tape, float, sand, texture if needed, prime, and paint. Since we paint it ourselves, there's no handoff where a marginal finish becomes someone else's problem.